top of page
PRODUCTION
Battery test
The first step in the process is to test the remaining capacity of the batteries and whether there are errors on the batteries that need to be rectified.
Dismantling the battery pack
The battery pack is disassembled to check the internal parts for faults. The individual modules are then dismantled for recycling.
Preparation for installation in plant
The battery modules are mounted and electrically connected in a single unit ready for installation.
Installation in container
The batteries are installed in a customized shipping container.
Testing and commissioning
The entire plant and all safety systems are tested before commissioning.
bottom of page